Laserfiche WebLink
History Well 21~ <br />• ~; Well 21~L History <br />(Includes A Groove, B Groove, and Dissolution Surface only) <br />~~. <br />Location ~ Section 21, T1S, R97W, 6"' PM <br />Coordinates Northing 13541.35, Easting 15301.17 <br />Collar Elevation 6283.4 ft amsl <br />Duration of Drilling July 9, to July 14, 1999 <br />Total Drilled Depth 1502 ft <br />Summary Report by Agapito Associates, Inc. November 1999 <br />Stra6graphic.Intervals and.Markers: ,_. ~~ `4 , ;:,;, .: .. _ : _ . _ :_; . <br />Uinta Formation Surface 692 ft <br />Green River Formation 692 -1502 ft <br />Parachute Creek Member 692 - 1502 ft <br />R-8 Zone 692 - 861 ft <br />A -Groove 861 - 884 ft <br />Mahogany Zone 884 -1068 ft <br />B -Groove 1068 -1092 ft <br />R-6 Zone 1092 - 1290 ft <br />L-5 Zone 1290-1389 ft <br />R-5 Zone 1389 ft <br />Dissolution Surface 1446 ft <br />Total Depth (TD) 1502 ft <br />• .Drilling and Well Completion <br />• Drilling began on well 21-4 on July 9, 1999. Drilling to a TD of 1502 was <br />completed by July 14, 1999. <br />• Well 21-4 was drilled from surface to 40 ft with a 19-inch-diameter tri-cone <br />rock bit. <br />A 14-inch-outside diameter (OD) surface conductor casing was run to 40 ft <br />and cemented in place. The top of the casing was set at ground surface. <br />• After the conductor casing cement hardened, a typical 12.25-inch- <br />diameter tri-cone long tooth button bit was used to advance the well to a <br />TD of 1502 ft. Rock chip samples were separated from drilling fluids in a <br />cyclone separator and passed over a Shaker table for recovery at 5-ft <br />intervals. Drilling fluid consisted of clear water, with a light bentonite and <br />polymer mud additive. <br />Dissolution Surface <br />• To prepare the bore hole for the first and deepest monitor well installation, <br />the hole was cemented from 1502 ft (TD) up to 1477 ft with 24 sacks of <br />Class A Type II cement with -1% calcium chloride. The cement was <br />placed in a series of vertical lifts via a string of 2.75-inch-OD tremie line <br />composed of nominal 20-ft pipe joints. <br />The Dissolution Zone well (21-4D) was installed after the cement set, and <br />completed with a 10-ft fiberglass, #20 slot screen at 1432 to 1442 ft near <br />the Dissolution Surface (1452 ft). <br />