My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO20327
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO20327
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:40 PM
Creation date
11/20/2007 1:28:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Hydrology
Doc Date
3/3/2000
Doc Name
BASELINE WATER QUALITY CHARACTERIZATION REPORT 7/1/99 THRU 10/31/99 CONT
From
AMERICAN SODA
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Risley Well 2Q1 <br />r~ <br />u <br />• <br />Well 20-1 History <br />Location NE %,, SE %,, SE'/, Section 20, T1S, R97W, 6"' PM <br />Coordinates Northing 13,876.35, Easting 14,745.95 <br />Collar Elevation 6232.5 ft amsl <br />Date of Drilling Original drilling in 1966 <br />Total Drilled Depth 2248 ft <br />fCnown Weft (nformation_ . _ _ .w .. _. ~,., . <br />Well 20-1 was completed in 1966, with a 4-inch I.D. surface casing to 803 <br />ft and open hole from 803 to 2,084 ft. <br />The hole was sealed with heavy mud at the time. <br />Deviation of the hole was unknown prior to re opening in April 1997, but <br />blockage was known to exist at 100 feet depth. <br />Parts of the locked cap were retrieved from the hole that was found to <br />contain other debris such as stones, metal fragments from the broken cap, <br />sticks of brush, and trash. <br />The well was deepened to 2248' in order to obtain additional geophysical <br />information about the Saline Zone. <br />The hole was plugged back with cement to 1365-ft. The top of the cement <br />at 1365 was tagged with NO flush joint wireline core rods which became <br />stuck in the hole as a result of the cement settling between the annular <br />space of the NQ core hole diameter and the OD of the NO core rods. <br />The NQ rod was cemented in the hole and the hole was reentered with <br />BQ drill rod and cored from 1365 to 1397-ft. <br />Sampling <br />July 25, 1999 water quality sample collected using stainless steel bailer. <br />August 27, 1999 water quality sample collected using stainless steel <br />bailer. <br />• September 26, 1999 water quality sample collected using dedicated gas <br />displacement pump. <br />October 1999 no water quality sample collected as a result of precipitate <br />plugging in the sample return line. <br />Notes <br />This well is not included in the Ground Water monitoring plan because in the <br />completion there is a possibility that all of the aquifers are not isolated from each <br />other and steel is used in the completion. <br />C~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.