Laserfiche WebLink
History Well 2&2B <br />• 2nd Development Phase <br />On July 21, 1999, water was air lifted from the newly recompleted well at a <br />rate of %z GPM. Total volume of water removed by July 24, 1999 was 450 <br />gallons. <br />Sampling ~~ <br />July 25, 1999 water quality sample collected using stainless steel bailer. <br />August 27, 1999 water quality sample collected using stainless steel bailer <br />September 27, 1999 installed gas displacement pump at 1033' center of <br />perforation for B Groove recompletion. <br />September 29, 1999 water quality sample collected using dedicated gas <br />displacement pump. <br />October 22, 1999 water quality sample collected using dedicated gas <br />displacement pump. <br />Notes <br />The location of this well is far from ideal in terms of long term monitoring due to <br />it's placement in the junction point of two potentially significant drainages. At this <br />time the well is not projected as a long term monitoring well because of it's <br />location and the anticipated action regarding this well includes plugging and <br />abandonment in Fall 2000. <br />• <br />r <br />