My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO20305
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO20305
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:39 PM
Creation date
11/20/2007 1:27:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002120
IBM Index Class Name
Hydrology
Doc Date
3/13/2006
Doc Name
Water Supply Plan
From
OSE
To
Leaf Engineering
Permit Index Doc Type
Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Forrest Leaf <br />March 6, 2006 <br />Page 5 <br />12. Should this substitute water supply plan expire without renewal or be revoked prior to <br />adjudication of a permanent plan for augmentation, all excavation of product from below <br />the water table, and all other use of water at the pit, must cease immediately. <br />13. In accordance with amendments to Section §25-8-202-(7), C.R.S. and "Senate Bill 89-181 <br />Rules and Regulations" adopted on February 4, 1992, the State Engineer shall determine <br />if this substitute water supply plan is of a quality to meet requirements of use to which the <br />senior appropriation receiving the substitute supply has normally been put. As such, water <br />quality data or analyses may be requested at any time to determine if the requirement of <br />use of the senior appropriator is met. <br />14. The decision of the state engineer shall have no precedential or evidentiary force, shall <br />not create any presumptions, shift the burden of proof, or serve as a defense in any <br />water court case or any other legal action that may be initiated concerning the substitute <br />water supply plan. This decision shall not bind the State Engineer to act in a similar <br />manner in any other applications involving other plans or in any proposed renewal of this <br />plan, and shall not imply concurrence with any findings of fact or conclusions of law <br />contained herein, or with the engineering methodologies used by the Applicant. <br />Should you have any questions, please contact Joanna Williams of this office or Mr. Scott <br />Cuthbertson of our Division office in Greeley at (970) 352-0742. <br />Sincerely, . <br />~~~~~~~L <br />Kevin G. Rein, P.E. <br />Chief of Water Supply <br />Attachments: Table 4 and Accounting Protocol <br />KGR/JMW <br />ce: Scott Cuthbertson, Assistant Division Engineer <br />Dave Nettles, Assistant Division Engineer <br />Robert Stahl, Water Commissioner, Water District 2 <br />Fred Renner, Water Commissioner, Water District 4 <br />Division of Minerals and Geology <br />
The URL can be used to link to this page
Your browser does not support the video tag.