Laserfiche WebLink
JIAIE OF COLORADO DECEIVED AUG 1 9 ~ <br />OFFICE OF THE STATE ENGINEER <br />821 Cemennial Bldg., 1313 Sherman SL, Denier, Colorado 80203 <br />' (303) 8663581 <br />INFORMATION FOR WELL PERMITS APPROVED PURSUANT TO CRS 37-92-602 <br />(HOUSEHOLD, DOMESTIC, LIVESTOCK AND EXEMPT COMMERCIAL USES) <br />EASE NOTE CAREFULLY THE CONDff10NS OF APPROVAL ON THE ATTACHED COPY OF YOUR PERMIT. <br />E CONDfiIONS MUST BE COMPLIID WITH IN ORDER FOA THE PERMIT TO BE VALID. <br />THE ISSUANCE OF THIS PEAMfT DOES NOT CONFER A DECREID WATER RIGHT. <br />PERMIT EXPIRATION DATE IS TWO YEARS FROM THE DATE ISSUID. The well must be constructed and <br />ence of it's construction must be submitted to this office in the form of a Well Construction and Test Report <br />the well construction contractor confirming that well construction was completed prior to expiration of the well <br />lit. The permit number is located in the upper right hand corner of the permit. The expiration date is located <br />e lower right hand comer. The expiration date may be extended at the discretion of the State Engineer for <br />i cause shown. ff You desire an extension, you must file a written reauest with this office prior to the expiration <br />shown on the permR. The request must state why the well has not been constructed, must include an <br />late of time required to complete the well, and must specify the length of extension you desire, not to exceed <br />(1) Year. <br />I110NAL INFORMATION REGARDING ;r. , ,~. _: .:.:1~ , ;; ..> C~'CO~"JUa'Yil`"R~0.fiItN~t~+1 REGULATIONS <br />WELL MUST BE CONSTAUCTID AND THE PUMP INSTALLED BY CONTRACTORS WITH CURRENT <br />NSE(S) ISSUED BYTHE STATE OF COLORADO unless exempted as described on the reverse side. The well <br />traction and pump installation reports must be submitted to the office of the State Engineer within sixty (60} <br />of completion of the work or within seven days after expiration of the permit, whichever is earlier. Your <br />actor must provide you with a copy of the work report(s) filed with the State Engineer. The Well Construction <br />lest Report, Form Number GWS~1 and the Pump Installation and Test Report, Form Number GWS-32 are <br />role from the Division of Water Resources offices. <br />ist two copies of the well permit have been provided. The owner's copy is for your records. The second copy <br />the pump installation contractor. Make additional copies for the well construction contractor if you select one <br />ant from the one indicated in your application. It you did not indicate a proposed driller on the application, <br />:opies of the permit are enclosed. DO NOT GIVE YOUR 'OWNER'S COPY' TO THE CONTRACTOR . <br />lriginal permit is on file in the Denver Office Records Section. Additional copies may be obtained for a Tee <br />~ cents per page. Arty change of mailing address or ownership should be reported to the State Engineer by <br />~w owner on a "Change in Ownership/Address°, form number GWS-11. <br />have questions, contact the Denver Office, or the Division Office where your well is located. <br />910N 1 DMSION 2 Box 5728 DMSION 3 Box 269 DMSION 4 Box 456 <br />Bth Ave Rm 321 219 W 5th Rm 223 422 4th St 1540 E Niagara <br />ley CO 80631 Pueblo CO 81003 Alamosa CO 81101 Mormose CO 81402 <br />352-8712 (719) 5423368 (719) 589-6683 (303) 249-6622 <br />ilON 5 Box 396 DMSION 6 Box 773450 DMSION 7 Box 1880 <br />3 US Hwy 6 & 24 625 So. Lincoln Ave 1474 Main St <br />d Spgs CO 81601 Stmbr Spgs CO 80477 Durango CO 81302 <br />1945-5665 (303) 879-0272 (303) 247-1845 <br />DENVER OFFICE <br />Rm 821 <br />1313 Sherman St <br />Denver CO 80203 <br />(303) 8663581 <br />