Laserfiche WebLink
4A-2V-Again, CBL was run to determine cement intervals. Good cement was <br />determined up to 800 FFS with adequate cement above 800' to isolate the Perched <br />Aquifer. Therefore, cement was run in two lifts within the well bore to surface. The <br />annulus was cemented to surface. <br />Abandon well markers were installed with BLM required identification. Surface <br />production pipes will be removed and drill pads re-contoured prior to winter. <br />Topsoil will be re-placed, area seeded and mulched. <br />If there are any questions please contact Mr. Rod Storey or myself. <br />Sincerely, <br />Ed Baker, REM <br />EHS Manager <br />CC: EPA <br />(D1VIG <br />