Laserfiche WebLink
WELL 4A-2V <br />PLUG AND ABANDONMENT <br />19 June 2005 <br />Rig up on well. Shut down for night. <br />20 June 2005 <br />Rig up T&M casing crew on well. Pull 1940 feet of 7 inch 23# production string from well. <br />Pick up 8-3/4 inch bit and run in well to 1936 feet. Pull bit from well. Shut down for evening. <br />21 June 2005 <br />Pick up and run in well with 9-5/8 Cast Iron Bridge Plug (CIBP). Set CIBP @ 1920 feet. Pull <br />out of well with tubing. <br />Rig up Wireline and run cement bond log to 1920 feet. Good cement bond up to 800 feet. <br />Ratty cement to surface from there up, but enough to prevent squeezing above Perched <br />aquifer to surface behind casing. <br />Run in well to 1890 feet with open ended pipe. Shut down for evening. <br />22 June 2005 <br />Rigged up Big 4 cementers. Pump 190 sacks 15.8 class G cement in well. Pulled tubing up <br />out of cement, 18 joints. Wait on cement to set. Tagged cement @ 1365 feet. Pulled up to <br />1330 feet. Pumped 335 sacks light 12.8# cement to surface. Pulled tubing from well. <br />Rigged down. <br />23 June 2005 <br />Pumped cement grout to fill well from top of cement plug to surface. Installed dry hole <br />marker in cement and welded to surface casing. <br />