Laserfiche WebLink
iii iiiiiiiiniiiiu <br />999 <br />E~~A <br />S Coa/Company Seneca Coal Company <br />RECEIVED <br />APR 11 1997 <br />Division of Minerals ;, ..o,,,,,yy <br />April 8, 1997 <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />R8: Seneca II Mine (C-80-005) Quarterly Stockpond Inspections <br />Dear Ms. Crosby: <br />Enclosed are copies of the first quarter Stockpond inspections <br />for those structures at Seneca II which have been constructed to <br />date. The 'as-built' certifications for those stockponds which <br />do not already have an existing 'as-built' report or which have <br />been modified from the original will be submitted as soon as <br />possible, once the field surveys have been conducted this <br />spring. All conditions appeared stable and acceptable. <br />Should you have any questions <br />Sincerel <br />Pp0 FlE <br />A <br />~V •• L <br />Mich 1'~. zsa},~La <br />Engi ~inq Man <br />please do not hesitate to call. <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />Gary Wendt (PWCC) <br /> <br />P.E. <br />APR 0 8 '1997 <br />Seneea Ceal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />