My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE48048
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE48048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:50:02 PM
Creation date
11/20/2007 1:25:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980003
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
POND HG-8 PRINCPAL SPILLWAY STRUCTURE MODIFICATION
Section_Exhibit Name
Exhibit I-I
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J' <br />feet of available storage. Figure 3, HG-8 Cross-Section, displays the discharge structure <br />configuration and shows the corresponding water surface elevations. In addition, the SEDCAD <br />modeling indicates that 2.70 acre-feet of storage is required to retain runoff from the 10-year, 24-hour <br />storm event. Figure 4, Pond HG-8 StagelStorage Curve, displays stage and the corresponding <br />storage for pond HG-8 which indicate that the pond capacity will be sufficient to contain the storm <br />run-off. The methodology and assumptions used in calculating runoff are included in Attachment 1. <br />Results ofthe SEDCAD modeling can be found in Attachment 2. The SEDCAD modeling indicates <br />that the retention time for the storm event inflows is in excess of seven days which will allow pond <br />storm event inflows to meet effluent limitations for settleable solids prior to being discharged into <br />receiving waters. <br />~:~s~~es~muym~x~nu~vs 7/16/96 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.