Laserfiche WebLink
Ms. Michelle Johnson <br />February 16, 2007 <br />Page 4 <br />not be concurrent with any findings of fact or conclusions of law contained herein, or with <br />the engineering methodologies used by the Applicant. <br />Please contact Heidi Frey of this office or Kalsoum Abbasi, Augmentation Coordinator, in <br />Pueblo at (719) 542-3368, if you have any questions concerning this approval. We conclude that <br />approval of this substitute water supply plan does not imply a position by this office on any related <br />litigation. <br />Sincerely, <br />~.~ ~` <br />Dick Wolfe, P.E. <br />Assistant State Engineer <br />Attachments: Tables 1, 2, 3, and 4 <br />cc: Steve Witte, Division 2 Engineer <br />John Van Oort, Water Commissioner, Water District 14 <br />Kyle Frisinger, Trans-Colorado Concrete (Division of Pete Lien & Sons, Inc.) <br />Michelle Johnson, Martin & Wood Water Consultants, Inc. <br />Gary Witt, Wright Water Engineers, Inc. <br />Division of Reclamation, Mining, and Safety <br />DW/HCF/St. Barbara Pit SWSP 2007.doc <br />