My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO20204
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO20204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:34 PM
Creation date
11/20/2007 1:25:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
4/8/2002
Doc Name
1st Quarter 2002 Sediment Pond
From
Seneca Coal Company
To
DMG
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />. 9Qater, Sediment, or Slurry Imp~o2und1mOents <br />INSPECTOR'S NAME: Dennis Jones DATE: ~,-) _+ 6 <br />D O <br />OO B <br />D <br />FACILITY <br />CONFIGURAT <br />ION <br />Cro Valley <br />Pond <br />ss DATE LAST INSPECTION: II~ Z - <br />SITE NAME: Pond #008 LOCATION: SWYa NWS~a Sec 7 TS N R86W <br />MINE NAME; Seneca ZI Mine ( Seneca Coal Col LOCATION: 7 1 mi SE of Hayde n CO <br />MINE I.D. NO.: CMLRD Permit No. C-80-005 OWNER'S REP.: Gregg Kitchen Gen Mgr <br />Circle or write in aporopriate response <br />1. Foundation preparation (removal of vegetation, stumps, topsoil: Yes <br />2. Lift thickness: 12 <br />3. Compaction according to approved plan: Yes <br />4. Burning (specify extent and location): No <br />5. Angle of slope: 3:1 upstream, 3:1 downstream Total = 6:1 <br />6. *Seepage (specify location, color, and approximate volume) <br /> From underdrain pipes: NLPi <br /> At isolated points on embankment slopes: Yes No N/A <br /> At natural hillside: Yes No N/A <br /> Over widespread areas: Yes No N/A <br /> From downstream foundation area: Yes No N/A <br /> "Boils" beneath stream or ponded water: Yes No N/A <br />7. Cracks or scarps on crest: Yes No N/A <br />8. Cracks or scarps on slope: Yes No N/A <br />9. Sloughing or bulging on slope: Yes No N/A <br />10. *Major erosion problems: Yes No N/A <br />11. Surface movements in valley bottom or on hillside: Yes No N/A <br />12. *Erosion of toe: Yes No N/A <br />13. *Water impounded against toe: Yes No N/A <br />14, Existing embankment freeboard: normal = 8 0' ~t? feet <br />15. Increase Decrease in water level: feet <br />16. Cracks, bulging, or erosion on upstream face: Yes No N/A <br />17. Visible sumps or sinkholes in slurry surface: N/A <br />18. *Clogging <br /> Spillway channels and pipes: Yes No N/A <br /> Decant system: N~ <br /> Diversion ditches: N~_A_ <br />19. *Cracking or crushing of pipes <br /> <br /> Spillway pipes: Yes No N/A <br /> Decant system: N A <br />20. Trash racks clear and in place: Yes- No N/A <br />*Major adverse changes in these items could cause instability and should be reported to the <br />Engineering Manager and Mine Superintendent for further evaluation. Adverse conditions noted in <br />these items should normally be described (extent, location, volume, etc.) in the space on the <br />back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.