Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(1 <br />Mine: New Elk ~v~cf 6 <br />NPDES ID. No.: None <br />Inspection Period: Third Quarter 2005 <br />Inspection Date: 09f26/05 <br />General Description or Reference fA Site Plan: ~[ <br />j ~~ ~ G rS ~ ~icr~ ~l•SC~~~t~rr~c~ S`~c^c~~~ ~e~~y~ ~ 1 cry tf ,r9cu% lt~~t <br />~\^o C~CSS\.~t~q ~p~n rGtK. (S 1~/ U~ 4K <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. <br />2). Erosion forming Gullies: <br />3). Is wave action posing erosion: <br />On the Upstream embankment? <br />Yes <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion pn be attributed to: <br />5). Is seepage orxxrning through the dam? Yes <br />Could this seepage pose potential instability? <br />None <br />,~ <br />Cam" <br />~o <br />SEDIMENT STORAGE CAPACf1Y <br />1). Has the design storage ppaaty of the reservoir been surpassed? ~~ <br />Yes '(_J' <br />Explain: <br />OTHER OBSERVATIONS: ~pjy~ J.~ L/R-S w~~ <br />~~~ ~~--- <br />MSHA Qualfied Impoundment Inspector <br />o~~~~s <br />Excellent Moderate ~ Poor <br />Extensive Some <br />Page 1 of 2 <br />