Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk <br />NPDES ID. No.: Pond #t3 <br />Inspection Period: Third Quarter 2005 <br />Inspection Date: 09/28J05 <br />General Description or Reference t_~o Site~ Plan: ,/ c,• ~~7"'y~-- - f <br />~~, is ~a~ ~ s to ~(- <br />-~+.r. ~ e ~-~-s~- r~ls p~ s d-Q-af^e~r, ~! ~ -~~c';~~ js °~-sy `t <br />Nc~rn ~ct r e oC ~/~OS' a.t~cc,~ <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. cel Moderate Few Poor <br />2). Erosion funning Gullies: Extensive Some ~ None <br />3). Is wave action pusing erosion: <br />On the Upstream embankment? Yes No y' <br />At the principal spillway inlet? Yes No V <br />4). Erosion of the downstream tce of the embankment? Yes No (/ <br />Cause of erosion can be attributed to: <br />~~ <br />5). Is seepage oaxrning through Ure dam? Yes <br />Could this seepage cause potential instability? <br />No !~ <br />PRINCIPAL SPIl1WAY <br />t). Is the principal spilMray system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). is erosion occurring at the discharge outlet? <br />Evaluate the severity: ~ Extensive Moderate <br />Yes ~ No <br />Yes c.- No <br />Yes ~- No <br />Yes No !- <br />Just starting None <br />Page 1 of 2 <br />