Laserfiche WebLink
_. , .. <br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(1 <br />Mine: New Elk <br />NPDES ID. No.: Pond #4 <br />Inspection Period: Third Quarter 2005 <br />Inspection Date: 09/26/05 <br />General Descripption or Referenceto Site Phan: 7 <br />l ,jla ,?`~pCt ey~ Co-rr tY`aC )=-~Yr<:(? ~/~S Lvl`^-~~r/~µ ,f~fv~rO~~~ <br />/.t/aS ~ ~~~ ~L4~ Gs vS e~ 2` ~`NNc~- 1~w-e(i ~ ~/'Drrr ~ /~bb~ /.~clA . <br />1). Adequaq of the vegetative wver. <br />2). Er~ion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream emt~nlrment? <br />At the prinapal spillway inlet? <br />Yes <br />Yes <br />4). Erasion of the downstream tce of the embankment? Yes <br />Cause of erosion pn be attributed to: <br />Few Poor <br />Few No <br />• No y' <br />No ~ <br />No Gr <br />5). Is seepage axurting through the dam? Yes <br />Couk1 this seepage cause potential instability't <br />No ~ <br />PRINCIPAL SPILLWAY <br />1). Is the principal splMray system in working ordeR <br />2). Is the inert free of debris and restrifive material? <br />3). Is the discharge outlet free of restrictive material? <br />4), Is erosion ocgrrting at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />'txcenenv Modeite <br />Extensive Some <br />Yes ~- No <br />lies" - v No <br />Yes L- , ~ No , <br />Yes No !/ <br />Just starting None <br />Page 1 of 2 <br />