Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk ~n/ l~ CBi't~lvlYYle~~y <br />NPDES ID. No.: None <br />Inspection Period: Third Quarter 2005 <br />Inspection Date: 0986/05 <br />Generei Description or Reference to Site Plan: ~ccL~: ~C i-C~ <br />~rs epyr~'/1[~vre~~~51.t/' [~ f~chf~~[s~i S''Cj.u' <br />Gn~°-~~,. i^w:cw/7l ~nv/l ~[J~[ ~'_ ar5~$~~~.-.r~ ll~~vaW~ ~n+'~2c1. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />Yes <br />4). Erosion of the downstr~m toe of the embankment? Yes <br />Cause of erosion can be attributed to: <br />,~N~o <br />C'~". <br />5). Is seepage occurting through the dam? Yes <br />Could this seepage cause potential inslabrlilyt <br />SEDIMENT STORAGE CAPACffY <br />1). Has the design storage ppaaly of the reservoir been surpassed? <br />Yes <br />F~lain: <br />OTHER OBSERVATIONS: <br />!f <br /> <br />N _ <br />l__9'~ <br />,/~~~. <br />MSHA Qualfied Impoundment I Spector <br />~~~~5 <br />Date <br />//Excelledt Moderate Few Paor <br />F~densive Some ~ None <br />Page 1 of 2 <br />