Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br /> Nearest major city or town within project area region : Glentivar <br />Transportation Cvcle Time : Non- Total one-way travel distance : 7.0 miles <br /> Roadable Roadable Average travel speed : 30.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.23 0.23 Total non-roadable mob/demob cost' : $815.98 <br />Retum time (hours) = 0.23 0.23 'two round Wps with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cast "' : $0.00 <br />Unloading time (hOUrs) = 0.50 NA •• one round tdp, no haul rig <br />Subtotals = 1.47 0.47 <br />... <br /> <br />JOB TIME AND COST <br />.. t .. <br />Total'ob time : _. <br /> <br />2,93 hours <br /> Total job cost : 5816 <br />EQUIPMENT HAUL DISTANCE and TIME <br />