Laserfiche WebLink
-~. <br />;~ <br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ Permit Field Visit <br />Person TRINIDAD BASIN Number C-81-048 Date 02/08/2000 Continuation Page <br />28. Performance Standard Categories <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=No[ Started, S=Noncompliance Identified E sewhere, 6=Previously Cited <br />I. _ Mining within Valid Permit <br />2 _ Mining within Bonded Area <br />3. _ Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Control <br />6. _ Temporary Cessation <br />7. _ AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />B. Hyd rologic Balance <br />I. _ Drainage Control <br />2. _ Inspections & Certifications <br />3. _ Siltation Structures <br />4. _ Discharge Structures <br />5. Diversions <br />6. EfFluent Limits <br />7._ Ground Water Monitoring <br />B. _ Surface Water Monitoring <br />9. _ Drainage -- Acid-Toxic Materials <br />10. _ Impoundments <br />I I. _ Stream Buffer Zones <br />C. Topsoil & Subsoil <br />l._ Removal <br />2. Substitute Materials <br />3._ Storage and Protection <br />D. <br />Backfilling & Grading <br />I._ Exposed Openings <br />2._ Contemporaneous Reclamation <br />3._ Approximate Original Contour <br />4._ Highwall Elimination <br />5._ Steep Slopes (includes downslope) <br />6._ Handling of Acid & Toxic Materials <br />7._ Stabilization (rills and gullies) <br />Excess Spoil Disposal <br />I._ Placement <br />2._ Drainage Control <br />3. Surface Stabilization <br />4._ Inspections & Certifications <br />Coal Mine Waste <br />(Refuse Piles/Impourrdments) <br />I._ Drainage Control <br />2._ Surface Stabilization <br />3._ Placement <br />4._ Inspections and Certifications <br />5._ Impounding Structures <br />Use Of Explosives <br />I._ Blaster Certification <br />2. Distance Prohibitions <br />3._ Blast SurveylSchedule - <br />4._Warnings & Records <br />5. Control of Adverse Effects - <br />E. <br />F <br />G. <br />I)forfeituze evaluation - <br /> Performance Standard Categories E. Excess Spoil Disposal ...........................................(8161817.7]-74) <br /> 30 CFR Counterpart I. Placement ................................................................... ........................71(e) <br />A. Administrative ................................. ............................ ........... 2. Drainage Control....................................................... .........................71(1) <br />I. Valid Permit ............................................ .. .. ...............................777 I I 3. Surface Stabilization.................................................. .........................71(8) <br />2. Mining within Bonded Area ................. ...............................773.1 I 4. Inspections &Certifications....................................... ........................71(h) <br />3. Terms & Conditions of Permit ............... ..............................773.17 F. Coal Mine Waste (Refuse Pites/Impoundmenls) ,, ,,,(8161817.81-84) <br />4. <br />5. Liability Insurance ................................. <br />Ownership and Con[rot .......................... ...............................800.60 <br />............................778.13 <br />I. <br />Drainage Control ...................................................... <br />.........................83(x) <br />6. Temporary Cessation ............................. .842.1 I (e) & 816/817.131 2, <br />3 Surface Stabilization.................................................. <br />Pl ........................83(b) <br />83( <br />) <br />7. AML Rec. Fees -- Non-Respondent ....... .........................870.I5(b) . <br />4. acement................................................................... <br />.................... <br />Inspections and Cenifications........... <br />.. c <br />........................ <br />.......................83(d) <br />8. AML Rec. Fees -- Failure to Pay ........... ..........................870.15(x) 5. . <br />.. <br />Impounding Structures ............................................... ............................84 <br />B. Hydrologic balance .......................... ............1816/817.41-57) <br /> G. Use of Explosives .............................................. ....(816/817.61-68) <br />I. <br />2. Drainage Control .................................... <br />Inspections&Certifications .................. .....................................45 <br />...........................49(x)(10) <br />I. <br />Blaster Certification................................................... <br />........................61(c) <br />3 Siltation Structures .. <br />. <br />............... <br />.. ..................................46 <br />. Z. Distance Prohibitions................................................. ........................61(d) <br />. <br />4. . <br />......... <br />. <br />. <br />Discharge Structures ............................. ... <br />......................................47 3. Blast Survey/Schedule................................................ .......................62-64 <br />5. Diversions .............................................. .....................................43 4. Warnings & Records ................................................. .....................66 & 68 <br />6. E(Ouent Limits ....................................... .....................................42 5. Control of Adverse Ef(ects........................................ .............................67 <br />7. Ground Water Monitoring ..................... .................................41(c) H. Subsidence Control Plan................................. ........(817.121-122) <br />8. Surface Water Monitoring ..................... .................................41(e) I. Roads................................................................ .(816/817.150-151) <br />9. <br />10. Drainage--Acid-Toxic Materials .......... <br />lmpoundments ....................................... .................................41(f) <br />.....................................49 <br />I. <br />Road Constmcuon...................................................... <br />.....................I50(c) <br />Il Stream Buffer Zones <br />.... <br />.. <br />.. <br />. ............57 <br />.............. <br />.. <br />.. 2. Certification............................................................... .......................151(x) <br />. . <br />. <br />.. <br />...... <br />.......... .... <br />. <br />. <br />.. 3. Drainage ..................................................................... ..........I50(b)'I51(d) <br />C. Topsoil &Subsoil .............................. .................(816/817.22) 4. Surfacing and Maintenance........................................ ..........I50(e)-I51(d) <br />I. Removal ................................................. .................................22(x) 5. Reclamation............................................................... .......................1500 <br />2. Substitute Materials ............................... ..................................22(c) J. Signs & Markers ............................................. ..........(816/817.11) <br />3. Storage and Protection ........................... ..................................22(c) <br />I. <br />.................................................................. <br />Signs...... <br />...........I I(a).(b).&(c) <br />4. Redistribution ........................................ ..................................22(d) .. <br /> 2. Markers ...................................................................... I I(a).(b),(d),(e),~(f) <br />D. Backfilling & Grading ................... ...........(816/817.95-107) K. Distance Prohibitions...................................... .................(761.11) <br />I. Exposed Openings .....................816/817 .13, 14, I5, & 823.1 I & 21 L. Revegetanon.................................................... .(816/817.111-116) <br />2. Contemporaneous Reclamation .............. ....................................100 <br />3. Approximate Original Contour............_ . ........................._l02(a)(l) I. Vegetative Cover....................................................... ................111 & il6 <br />4. Highwall Elimination .............................. ...........................102(x)(2) 2. Timing....................................................................... ...........................113 <br />5. Steep Slopes (includes downslope) ......... ...................................107 M. Postmining Land Use..............................................(816/817.133) <br />6. Handling of Acid & Toxic Materials ....... ...............................102(c) <br />7. Stabilization(rills and¢ullies) ................ ..................................951b) a~.,.m rxamn~, a_ivuv Page 2 of <br />H. _Subsidence Control Plan <br />I. Roads <br />I._ Road Construction <br />2. Certification <br />3._ Drainage <br />4._ Surfacing and Maintenance <br />5. Reclamation <br />J. Signs & Markers <br />I. Signs <br />2. Markers <br />K. _Distance Prohibitions <br />L. Revegetation <br />I._ Vegetative Cover <br />2. Timing <br />M. _Postmining Land Use <br />N. Other <br />General <br />Performance <br />Category <br />