Laserfiche WebLink
TABLE III <br />REFUSE PILE SITE CONSTRUCTION <br />Item <br />Strip Topsoil, Subsoil and <br />Stockpile <br />Construct Temporary Collection <br />Channel <br />Rip Rap Temporary Collection <br />Channel <br />Construct Perimeter Drainage <br />Channel <br />Rip-Rap Perimeter Drainage <br />Channel <br />Excavate Underdrains <br />Line Drains w/Mirafi 140N <br />Install Drain Fill & Mirafi <br />Install Piezometers P-1, P-4 <br />Install Survey Monumegts <br />~=1 thru 5-4 <br />C'drtstruct Overflow Structures <br />uantit <br />70,000 CY <br />4,050 LF <br />4,050 LF <br />2,900 LF <br />2,400 LF <br />2,100 LF <br />25,200 SF <br />622 CY <br />2 EA <br />Unit Cost Total Cost <br />3.00/CY $210,000.00 <br />$0.66/LF $ 2,700.00 <br />$533/LF ,$,.13,500.00 <br />$0.44/LF $; 1,289.00 <br />52.22/LF . .E .6,444.00 <br />" " $0.89/LF: . $'.1,867.00 <br />. $0.14/SF ~.. ,$. , 3, 528.00 <br />$15.00/CY ~; ~$ " 9, 330.00 <br />$1;A00.00/Ei1• ,;; ;5 .2,000.00 <br />4 EA $250.00/EA $..1,000.00 <br />2'EA $750.00/EA _ ,.$...1',500.00 <br />TOTAL $253;156.00 <br /> <br />