Laserfiche WebLink
~- <br />TABLE I <br />COS7 ESTIMATE - ACCESS ROAD <br />Item Description uantit Unit Unit Price Total <br />1 Topsoiling 4,000 CU. YDS. $ 1.50 $ 6,000 <br />2 Excavation and 60,000 CU. YDS.. 7.00 420,000 <br /> Stockpiling <br />3 Aggregate Base 5,600 CU. YDS 18.00 100,800 <br /> Course <br />4 Binwall 2,000 SFT. 30.00 60;000. <br />5 Berm 2,000 CU. YDS 12.00 24.000 <br /> $610,800 <br /> IO% Contingency 61,080 <br /> TOTAL $671,880 <br /> <br />;~ <br />