My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO20121
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO20121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:41:31 PM
Creation date
11/20/2007 1:22:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
10/21/1994
Doc Name
3rd Qtr 1994 Inspection
From
PEABODY WESTERN
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />Stockponds or Sumps <br />INSPECTOR'S NAME: Michael G. Altavilla DATE: 09/28/94 <br />FACILITY CONFIGURATION: Stockoond DATE LAST INSPECTION: 06/08/94 <br />SITE NAME: T-8 SITE LOCATION: NE~aSW~a, Sec 12 .T6N,R87W <br />MINE NAME: Seneca II LOCATION: 7.1 mi SE of Havden , Colorado <br />MINE I.D. NO.: C-80-005 OWNER'S REP.: Scott Williams, Sunt. <br />Circle or write in avvrooriate resnoase <br />1. Angle of elope: 3:1 upstream, 3.5:1 downstream <br />2. *Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment slopes: <br />At natural hillside: <br />Total = 6.5.1 N/A <br />Yes ~NO~ N/A <br />Yes ~ N/A <br />Over widespread areas: Yes ~~ N/A <br />From downstream foundation area: Yes ~~ N/A <br />"Boils" beneath stream or ponded water: Yes ~ N/A <br />3. Cracks or scarps on crest: <br />4. Cracks or scarps on elope: <br />5. Sloughing or bulging on slope: <br />6. *Major erosion problems: <br />7. Surface movements in valley bottom or on hillside: <br />8. *Eroeion of toe: <br />9. *Water impounded against downstream toe: <br />10. Existing embankment freeboard: <br />11. Increase Decrease in water level: No chanoe <br />12. Cracks, bulging, or erosion on upstream face: <br />13. Spillway erosion: <br />14. *Clogging <br />Spillway channels: <br />Diversion ditches: <br />Ye9 ~ N/A <br />Yes IV~~ N/A <br />Yes (~lo.~ N/A <br />Yes ~ N/A <br />Yes ~ N/A <br />Yes ~ N/A <br />Yes ~ N/A <br />11 feet <br />_ feet <br />Yes ~ N/A <br />Yes ~ N/A <br />Yes J~p~ N ~. <br />Yes No <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the apace on the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.