Laserfiche WebLink
v • <br /> <br />impoundment criteria of Rule 4.05.9(3), the State Engineer's Office or C.R.S. 37-87- <br />105. <br />The attached inspection sheet covers other items related to the ongoing performance of <br />the pond at the time of the inspection. <br />1 certify that the sediment pond at the Rimrock Mine has been constructed according to <br />the plans and is functioning well witH Prudent state-of--the-art engineering has been <br />employed and the dam is sound, with no current environmental threats or construction <br />& maintenance problems. <br />0 REQ <br />~~QP~y ~ ,,~•9 <br />o .t,0 1 ~~: ^o <br />~~~ s/e 98 <br />~.~, c~; <br />20336 <br />ct <br />'0 ~ <br />9o ss-niub~~`'~ <br />} <br />