Laserfiche WebLink
n <br />LJ <br />LODESTAR ENERGY, INC. <br />Permit No. 92GA1494 <br />Initial Approval <br />Page 2 <br />4. This source shall be Ilmlted to a maximum production rate as listed below and all ocher activities, <br />operational rates and numbers of equipment as stated in the application. Annual rewrds of the actual <br />production rate shall be maintained by the eppllcant and made available to the Division far inspection <br />upon request. (Reference: Regulation 3, Part B.III.A.4) <br />Production of coal shall not exceed 1,200,000 tans per year. <br />Compliance with the yearly production limks shall be detannined on a rolling twelve (12) month total. <br />5. All previous versions of this permit are canceled upon issuance of this permk. <br />6. Within one hundred and eighty days (180) after commencement of operation, compliance with the <br />condttlons contained on this permit shall be demonstrated to the Division. It is the permittee's <br />responsibility to self certify compliance with the conditions. Failure to demonstrate compliance within <br />180 days may result in tavacatlon of the pemltt. (Information on how to certify compliance was mailed <br />with the permk ar can be obtained from the Division at 303.692-3209.) <br />45/1713 ver 11/99 • <br />