My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47913
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47913
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:55 PM
Creation date
11/20/2007 1:21:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004A
IBM Index Class Name
Permit File
Doc Date
5/13/2002
Section_Exhibit Name
APPENDICES D - G
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LODESTAR ENERGY, INC. <br />Penntt No. 99GA06132F <br />Initial Approval <br />Page 8 <br />PARTICULATE EMISSIONS CONTROL PLAN FOR MINING ACTIVffIES <br />THE FOLLOWING PARTICUlJ1TE EMISSIONS CONTROL MEASURES SHALL BE USED FOR <br />COMPLIANCE PURPOSES ON THE ACTIVITIES COVERED BY THIS PERMIT, AS REQUIRED BY THE AIR <br />QUALITY CONTROL COMMISSION REGULATION NO.i, Section III.D.1.b. THIS SOURCE IS SUBJECT TO <br />THE FOLLOWING EMISSION GUIDELINES: <br />a. Mining Activities -Visible emissions not to exceed 20%, no off-pr^perty transport of visible emissions. <br />b. Haul Roads - No ^ff-property transport of visible emissions shall apply to on-site haul roads, the <br />nuisance guidelines shall apply to off-site haul roatls. <br />c. Haul Trucks - No off-property transport of visible emissions except that when operating off the properly <br />of the owner or operator, the applicable guidelines shall be no off-vehicl®transport of visible emissions. <br />Control Measures <br />• <br />1. Emissions from material handling (i.e. removal, loading, and hauling) shall be controlled by watering <br />al all times unless natural moisture is sufficient to control emissions. <br />2. Unpaved haul roads shall be treated with chemical stabilizers per manufacturer's specifications. • <br />3. Unpaved haul roads shall be watered as often as needed to control fugitive particulate emissions. <br />4. Coal stockpile shall be compacted. <br />5. Conveyor and processing equipment transfer points shalt be partially enclosed. <br />6. Haul truck speeds on the 170 meters of haul read nearest the public highway shall not exceetl 5 mph. <br />Speed limit signs shall be posted. ' <br />45/17!485 ver 11!99 • <br />
The URL can be used to link to this page
Your browser does not support the video tag.