Laserfiche WebLink
* MAINTENANCE REQUIRED: Clean PP-1 Pond which has silted in with <br />fines and recyle in thickner tank. Started construction of weir <br />plate for PP-2 Pond as per N.O.V. abatement measures. Lined Check <br />dams in Scullion Gulch starting 3/17/93-3/19/93. Install straw bales <br />below Check Dam ;Y3 for additional coal fines mitigation on 3/17/93. <br />**+****+***********,r***************************:***,r*,r********,r• <br />NAME OF INSPECTOR: TIM CHERVICR -ENVIRONMENTAL COORDINATOR: <br />SUBMIT REPORT TO: <br />COLORADO MINED LAND RECLAMATION DIVISION: <br />423 CENTENNIAL BUILDING 1313 SHERMAN STREET: <br />DENVER, COLORADO 80203: <br />