My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47866
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:53 PM
Creation date
11/20/2007 1:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certifcation Report Phase IVa
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LJ <br />B. Coarse Aggregate, ASTM C 33, except that clay and shale particles shall not exceed 1 percent of <br />total aggregate. <br />C. Fine Aggregate, ASTM C 33, washed natural sand. <br />2.02 MIXES: <br />A. Mix Designs: <br />Concrete mix design shall be designed by an independent testing laboratory. <br />B. Cast-In-Place Concrete: <br />Cast-in-place concrete with reinforcing steel shall have a minimum 28-day compressive <br />strength of 4,000 psi. <br />2. Maximum Aggregate size of 1-inch. <br />3. Placement slump between 2-inches and 5-inches. <br />4. Air entrainment of 5% to 8%. <br />2.03 CURING COMPOUNDS: <br />Concrete curing compound shall be a clear compound complying with ASTM C 309, Type 1-D, Class A <br />and B, such as "RES-X" by Burke, or an equivalent approved by CERTIFYING ENGINEER. <br />i <br />3.01 STRUCTURAL CONCRETE: <br />PART 3: EXECUTTON <br />Place structural concrete as shown on DRAWINGS. <br />3.02 INSTALLATION: <br />A. Ready-Mix Concrete shall be batched, transported, and placed in accordance with ASTM C 94. <br />Each batch delivered to the Si[e shall be accompanied by a certiSed weightmaster's delivery <br />ticket. <br />B. All mixed concrete delivered to the Site shall be placed within ninety (90) minutes from the time <br />of introduction of cement and water into the mix. <br />C. No water shall be added after leaving the batch plant without the approval of CERTIFYING <br />ENGINEER. <br />D. Placement of concrete, once started, shall be performed as a continuous operation until the <br />scheduled placement is completed. <br />E. Cold joints shall be approved by CERTIFYING ENGINEER. <br />F. Concrete shall be thoroughly compacted by vibrating with suitable tools during placement, <br />around embedded fixtures, and into the comers of forms. <br />Section 03300 Page 2 of 4 March 22, 2000 <br />Cast-In-Place Concrete Golder Associates Revision 4 <br />I:lON22113 W10piCER"f'REPo802NPPEfJpS W PPE103100R4 DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.