5.01 PRECONSTRUCTION MEETING: <br /> <br />MANAGER will hold a preconstruction meeting at the site prior to the start of construction. <br />MANAGER, DESIGN ENGINEER, CERTIFYING ENGINEER, CQA Monitor, CONTRACTOR, <br />and others designated by MANAGER shall attend this meeting. The purpose of this meeting will be to: <br />- review the construction DRAWINGS, CQA Plan, and SPECIFICATIONS; <br />- define the responsibilities of each party; <br />- define lines of communication and authority; <br />- review method of documentation, testing procedures, and reporting inspection data; <br />- establish testing protocols and procedures for correcting and documenting construction <br />deficiencies; and <br />- discuss any changes that may be needed to ensure that construction will be completed in <br />compliance with the design. <br />- This meeting will be documented by MANAGER and copies will be distributed [o all <br />parties. <br />J <br />5.02 PROGRESS MEETINGS: <br />MANAGER will hold a daily progress meeting, either before the start of work or at the completion of <br />work. At a minimum, this meeting will be attended by the CQA Monitor and CONTRACTOR. The <br />purpose of this meeting will be to: <br />- review all the previous day's accomplishments and activities; <br />- review scheduled work location and activities for the day; <br />- discuss any problems or potential construction problems; and, <br />- review test data. <br />5.03 DEFICIENCY MEETINGS: <br />Special meetings will be held, as needed, to discuss potential problems or deficiencies. At a minimum, <br />these meetings will be attended by the CQA Monitor and CONTRACTOR. If the problem relates to a <br />design issue, MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER should also be <br />present. The meeting will be documented by the CQA Monitor. <br />Section 01400.1 Page 4 of 10 <br />Earthworks CQA Plan Golder Associates <br />LW%22t13NG W ~CPRlRFPU802WPPENDSUPPEU114001R5.DEC <br />March 22, 2000 <br />Revision 5 <br />