Laserfiche WebLink
2.02 MANUFACTURER QUALITY CONTROL: <br />. CONTRACTOR shall ensure that geogrid MANUFACTURER meets the conditions in this section. <br />A. Geogrid Tests and Inspection <br />1. Geogrid MANUFACTURER shall perform quality control testing of the geogrid. <br />Samples not satisfying specifications shall result in the rejection of applicable rolls. At <br />a minimum, the following tests shall be performed for quality control in accordance <br />with test methods specified in Table 2.01. <br />a. Density <br />b. Mass per unit area <br />c. Thickness <br />d. Cazbon black content <br />2. At geogrid MANUFACTURER'S discretion and expense, additional testing of <br />individual rolls may be performed to more closely identify noncomplying rolls and to <br />qualify individual rolls. <br />3. Geogrid manufacturer shall perform quality control tests at a frequency of at least every <br />50,000 fl of geogrid produced. <br />PART 3: EXECUTION <br />3.01 EXAMINATIONS; <br />. A. Conformance Testing <br />2. <br />3 <br />3.02 INSTALLATION: <br />Geogrid manufacturer shall supply samples of geogrid to CQA ENGINEER for <br />conformance testing. Unless otherwise specified, samples shall be taken at a rate of one <br />per lot, not to exceed one conformance test per 100,000 squaze feet of geogrid. <br />For geogrid, the following tests shall be performed using the procedures listed in <br />Exhibit C: <br />a. Mass per unit area <br />b. Aperture size <br />c. Wide strip tensile strength <br />d. Node strength <br />Geogrid shall be rejected if conformance test results do not meet or exceed the values <br />presented in Table 2.01. <br />A. Geogrid Deployment <br />1. No equipment or tools shall damage the geogrid by handling, trafficking, or other <br />• means. <br />Section 02776.1 Page 4 of 5 December 9, 1998 <br />Geogrid Golder Associates Revision 3 <br />I.\ W\2203W40U\CERTAEPo802\APPENDSUPPEW2]]61R3.DOC <br />