My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47866
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:53 PM
Creation date
11/20/2007 1:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certifcation Report Phase IVa
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. 3-inch diameter, "Highway-Grade" PCPE pipe, as manufactured by Advanced Drainage <br />Systems, Inc., or an equivalent approved by MANAGER, DESIGN ENGINEER and <br />CERTIFYING ENGINEER. <br />C. Low Volume Solution Collection Pipe: <br />1. 14-inch diameter solid SDR 11 HDPE pipe. <br />2. 4-inch "Highway Grade" perforated corrugated polyethylene (PCPE) pipe, as <br />manufactured by Advanced Drainage Systems, Inc., or an equivalent approved by <br />MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER <br />D. Underdrain Pipe: <br />1. 12-inch diameter "N-12" PCPE pipe, as manufactured by Advanced Drainage Systems, <br />Inc., or an equivalent approved by MANAGER, DESIGN ENGINEER and <br />CERTIFYING ENGINEER <br />PART 3: EXECUTION <br />3.01 INSTALLATION: <br />A. CONTRACTOR shall install pipe according to MANUFACTURER'S recommendations. <br />B. CONTRACTOR shall take all precautions necessary to not damage the pipe during mazerial <br />• placement. CONTRACTOR may periodically be requested by MANAGER to verify that <br />covered pipe has not been crushed. Costs associated with proving pipes have not been crushed <br />shall be borne by CONTRACTOR. <br />C. Piping shall be placed to the lines and elevations shown on the DRAWINGS, with no sags or <br />humps, as approved by MANAGER and CERTIFYING ENGINEER. <br />3.02 PIPE CONNECTIONS: <br />A. All connections for non-perforated pipe shall be watertight under maximum anticipated pressure <br />head. <br />B. The ends of all pipe shall be capped with a manufactured pipe cap. <br />C. Alt connections is non-perforated pipe will be watertight. <br />D. HDPE pipe will be butt-heat-fusion welded in accordance with the MANUFACTURER'S <br />guidelines. <br />E. PCPE pipe joints shall conform to MANUFACTURER'S recommendations. <br />3.03 BEDDING AND BACICFILL: <br />A. CONTRACTOR shall place and compact Leak Detection Fill in accordance with Item 3.06.E of <br />Section 02200.0. <br />Section 02710 Page 2 of 3 March 22, 2000 <br />Piping Golder Associates Revision 4 <br />l:It%V¢20.1109001CERTREPOHp21APPADSW PPE1993-209902]IroR9 DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.