deficiencies shall be reworked by CONTRACTOR, until acceptable measurements aze <br />• obtained at no additional cost to CC&V. If tests indicate the Work does not meet the <br />requirements of the SPECIFICATIONS, MANAGER and CERTIFYING <br />ENGINEER will establish the extent of the nonconforming azea. The nonconforming <br />area shall be reworked by CONTRACTOR until acceptable test results aze obtained at <br />no additional cost to CC&V <br />9. Prior to any geosynthetics being placed on Bedding Fill, the area will be tested by CQA <br />Monitor. No geosynthetics will be allowed to be placed on frozen material, as defined <br />in Section 3.06, without the azea in question being retested by the CQA Monitor. <br />3.07 EQUIPMENT: <br />CONTRACTOR may use any type of earthmoving or excavating equipment unless otherwise noted in the <br />SPECIFICATIONS, provided the equipment is in a satisfactory condition, complies with applicable rules <br />and regulations, is of such capacity that the construction schedule can be maintained as planned by <br />CONTRACTOR, and is approved by MANAGER <br />*** END OF SECTION *** <br />r, <br />LJ <br />Section 02200 Page 17 of 17 Mazch 22, 2000 <br />Earthworks Golder Associates Revision 7 <br />I:~AOU2WW4W~CERTREPo6pTWPPENDSNPPEO]20DR].000 <br />