Laserfiche WebLink
will achieve the required density, or bentonite. Areas with deficiencies shall be <br />• reworked by CONTRACTOR, until acceptable measurements aze obtained at no <br />additional cost to CC&V. <br />18. If tests indicate the Work does not meet the requvements of the SPECIFICATIONS, <br />MANAGER and CERTIFYING ENGINEER will establish the extent of the <br />nonconforming area. The nonconforming area shall be reworked by CONTRACTOR <br />until acceptable test results are obtained at no additional cost to CC& V <br />19. Prior to any geosynthetics being placed on Soil Liner Fill, the area will be tested by <br />CQA Monitor. No geosynthetics will be allowed to be placed on frozen material, as <br />defined in Section 3.06, without the azea in question being retested by the CQA <br />Monitor. <br />H. Drain Cover Fill <br />1. Drain Cover Fill shall be placed over the geomembrane in the locations shown on the <br />DRAWINGS. <br />2. Prior to placing the Drain Cover Fill, CONTRACTOR shall verify by visual inspection <br />that the underlying geosynthetics aze free of holes, tears, wrinkles, or foreign objects. <br />MANAGER and CERTIFYING ENGINEER will inspeM the geosynthetic for <br />wrinkles prior to placement of Drain Cover Fill. As instructed by MANAGER, <br />CONTRACTOR shall "work out" wrinkles to the satisfaction of MANAGER and <br />CERTIFYING ENGINEER prior to placement of the Drain Cover Fill. In all cases, <br />wrinkles shall not be of a size that they could fold back on themselves. Wrinkles <br />greater than one foot shall be removed and repaired by the INSTALLER. <br />3. CONTRACTOR shall place Drain Cover Fill in a single 24-inch loose lift. The <br />• tracked equipment shall operate only over pzeviously-placed Drain Cover Fill. <br /> CONTRACTOR shall no[ operate equipment directly on geosynthetics. Only a dozer <br /> with a ground pressure not exceeding 8.7 psi can be used to place Dmin Cover Fill. A <br /> CAT 12G motor grader, or equivalent approved by CERTIFYING ENGINEER, can <br /> be used for Drain Cover Fill final grading. Equipment used for placement will not be <br /> allowed to pivot on one track (i.e., no abrupt or sharp toms). There shall be no downhill <br /> placement on slopes steeper than 4H:1 V. Material can be placed along contours if <br /> buttressed from below. Motor graders shall not be allowed to make abrupt toms, brake <br /> suddenly, or dig blade in which results in the tires spinning on the Drain Cover Fill <br /> surface. <br />4. Highway compatible Rubber tired construction equipment shall not be allowed to travel <br /> over the geomembrane or on top of Solution Collection piping unless a thickness of at <br /> least 45 inches of Drain Cover Fill has been placed over the geomembrane and on top <br /> of Solution Collection piping. The CONTRACTOR will be required to demonstrate to <br /> the MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER that the <br /> equipment and procedures used are not detrimental to the geomembtane and piping, at <br /> no cost to CC&V. Off road haul tinck traffic shall require a minimum of 60 inches for <br /> Cat 773 (or equivalent) of Drain Cover Fill placed over the geomembrane and solution <br /> collection piping, and a minimum of 120 inches for CAT 777 (or equivalent) of Drain <br /> Cover Fill placed over the geomembrane and solution collection piping. <br />5. When placing Drain Cover Fill the maximum acceptable drop height is 3 feet. <br />6. CONTRACTOR shall operate equipment in a manner that is protective of underlying <br /> geosynthetics. If MANAGER or CERTIFYING ENGINEER suspects the <br /> occurrence of any damage to the underlying geosynthetics, MANAGER will instinct <br /> CONTRACTOR to remove Drain Cover Fill to expose the geosynthetics. <br />Section 02200 Page 14 of 17 March 22, 2000 <br />Earthworks Golder Associates Revision 7 <br />l ~O V3201\0900~CCFR'IRF.Po803 W PPEI~IDS~APPeA2200R~. DOC <br />