My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47866
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:53 PM
Creation date
11/20/2007 1:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certifcation Report Phase IVa
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />8. Coarse Shaft Backfill -material as approved by MANAGER and CERTIFYING <br />ENGINEER confotming to the following SPECIFICATIONS: <br />9. Fine Shaft Backfill -material as approved by MANAGER and CERTIFYING <br />ENGINEER conforming to the following SPECIFICATIONS: <br />S~$ `d-r '~"` P°en[Pas''vsitig , <br />S~eg, ize° b _ ei' t <br />2-inch 100 <br />3/4-inch 70 100 <br />No. 40 20 - 50 <br />No. 200 2 - 15 <br />Plasticity Index: 5 maximum <br />10. Pipe Bedding Material -material as approved by MANAGER and CERTIFYING <br />ENGINEER conforming to the following SPECIFICATIONS: <br /> <br /> 1~J S~Start d <br /> <br /> <br />StexeiSize~_ _ <br />~. Pereeut'P~sing, <br />,~ <br /> <br />k ;;. ~ et ~~ ' <br />2-inch 100 <br />No. 4 30 -100 <br />No. 200 5 - 20 <br />Plasticity Index: 5 maximum <br />11. Granulaz Filter Material -material as approved by MANAGER and CERTIFYING <br />ENGINEER conforming to the following SPECIFICATIONS: <br />IJ $ Ste 8'YSyI ~" <br />,, Y„,~*:.~~`°Steve>Size.;~- ~~ ~ ~ xCrCe~[ Pa351ng } ,.p G <br />'-_~~~~b D. Wet hf,~~,~~,,~„q <br />3-inch 100 <br />2-inch 75 - 100 <br />No. 200 0-15 <br />PART 3: EXECUTION <br />3.01 CLEARING AND GRUBBING: <br />A. Clearing and grubbing shall be done within the footprint of the limits of the construction azea, as <br />delineated on the DRAWINGS. Clearing shall extend a maximum of 15 feet and a minimum of <br />]0 feet outside of the consWction limits or as duetted by MANAGER. Areas for clearing shall <br />be released to CONTRACTOR by MANAGER. No pioneering of roads across undisturbed <br />areas shall be allowed without prior approval of MANAGER. <br />I• <br />B. No clearing shall be performed until written permission is given by MANAGER and until the <br />CONTRACTOR has provided construction staking for the proposed work. Clearing shall <br />consist of cutting brush to the ground level, removing such material, along with wood, rubbish, <br />Section 02200 Page 4 of 17 March 22, 2000 <br />Earthworks Golder Associofes Revision 7 <br />I:100122031090O~CIIt'fRFP0902~1PPENDSNPPE1a2200R'I.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.