Laserfiche WebLink
- geosyn[hetic quality assurance documents; <br />• - geomembrane installation observations, such as for deployment, trial seams, defect repair, <br />destruct testing and non-destructive testing; <br />- sampling, testing locations, and test results; <br />- changes to the design DRAWINGS or project SPECIFICATIONS and the justification <br />for these changes; <br />- record DRAWINGS; and <br />- a certification statement that construction was completed in compliance with the <br />DRAWINGS and SPECIFICATIONS, signed, and sealed by the CERTIFYING <br />ENGINEER registered in the State of Colorado. <br />*** END OF SECTION *** <br /> <br />Section 01400.2 Page 11 of 11 Mazch 22, 2000 <br />Geosynthetic CQA Plan Golder Associates Revision 5 <br />1 \00\2103100001CERiREPo802V,PPENDSWPPE~OtA002R5.DOC <br />