My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47866
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:53 PM
Creation date
11/20/2007 1:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certifcation Report Phase IVa
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 7.0 DOCUMENTATION <br /> <br />Documentation kept by the CQA Monitor shall consist of daily record-keeping, construction problem <br />resolutions, design and SPECIFICATION changes, photographic records of construction, weekly progress <br />reports, chain of custody forms for test sample tracking, and a Conshvction Certification Report. <br />7.01 DAII,Y RECORD KEEPING: <br />Daily records kept by the CQA Monitor shalt consist of field notes, observation and testing data sheets, <br />summary of the daily meeting with CONTRACTOR, and reporting of constuction problems and <br />resolutions. The CQA Monitor shall submit this information on a regular basis to MANAGER for <br />review. <br />7.02 SOILS OBSERVATION AND TESTING FORMS: <br />The CQA Monitor will document soils observations on forms that generally include the following <br />information: <br />- date, project name, location, and weather data, including high and low daily temperatures; <br />- a site plan showing work azeas and test locations; <br />- descriptions of ongoing construction detailing work azeas and equipment utilized by <br />CONTRACTOR; <br />- summary of test results and samples obtained, with locations and elevations; <br /> <br />- resolutions of deficient test results; <br />- test equipment calibrations, if necessary; <br />- summary of meetings held; and, <br />- signature or initials of the CQA Monitor. <br />?.03 PHOTO DOCUMENTATION: <br />The CQA Monitor shall photograph all phases of cons[mcfion. Photogaphs shall be identified by <br />location, time, date, and name of the CQA Monitor taking the photograph. <br />7.04 DESIGN AND SPECIFICATION CHANGES: <br />During construction, the need to address DESIGN and SPECIFICATION changes, modifications, or <br />clarifications may arise. In such cases the CQA Monitor shall notify MANAGER, which shall notify the <br />DESIGN ENGINEER and the CERTIFPING ENGINEER. DESIGN and SPECIFICATION changes <br />shall only be made with written agreement from MANAGER and DESIGN ENGINEER. <br /> <br />Section 01400.1 Page 7 of 10 <br />Earthworks CQA Plan Golder Associates <br />I \00~2303N000ICFRTREP0803UPPENDSWPPE,Ot4001R5.DOC <br />Mazch 22, 2000 <br />Revision 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.