Laserfiche WebLink
Mr. Thomas Donkle <br />May 25, 2005 <br />Page 7 <br />Table 1.2 <br />MONTHLY DISTRIBUTION <br />FOR DEPLETION & REPLACEMENT REQUIREMENTS <br />For Maximum Year Depletion <br />2006 <br />(All values in acre-feet) <br />i <br />i <br />Lagged <br />Replacement <br />Excess B. H. <br />Month Evaporative provided from Eaton Ditch <br />i and 17.7 acres of dry- credits to be <br />i Operational up credits under stored in the <br /> Depletions the B. H. Eaton lined Eagle Lake <br />i Ditch water rights' or used fo <br /> replace historical <br />i return flow <br />~ <br />I obligations <br />January 1.78 0.00 0.00 <br />February 1.82 0.00 0.00 <br />March 1.88 0.33 0.00 <br />April 1.90 1.90 0.26 <br />May 1.94 1.94 4.56 <br />June 2.01 2.01 8.08 <br />July 2.01 2.01 6.48 <br />August 2.04 2.04 1.73 <br />September 2.04 0.45 0.00 <br />Oct ber 2.01 0.00 0.00 <br />Novernber 1.98 0.00 0.00 <br />December 1.91 0.00 0.00 <br />Total 23.32 10.68 21.11 <br />I <br />Note: For any month that insufficient dry-up credits exist to replace evaporative and operational <br />depletions, and historical irrigation return flow obligations, applicant will release previously <br />stored dry-up creditis from Eagle Lake. <br />