Laserfiche WebLink
• stripping operations along the entire length of the final highwall as shown on Exhibit 12-3. <br />For rules 4.23.214) and 4.23.2(51, special plugging procedures are not proposed for this set of auger <br />holes. The holes will be plugged by backfil ling operations as a normal part of the <br />I <br />• <br />PR04 12-2-ia Revised 04/04 <br />