Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />STATE OF COLURP~UU <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone. (3037 866-3581 <br />FA\: (303) 866 3589 <br />help://walerstate.co.us/deiaulthlm <br />Response to Reclamation Pern~it Application Consideration <br />pF'CO~ ' <br />,s~, °a <br />ye :~ <br />~o <br />1B l6 ~ <br />Bill Owens <br />Governor <br />Greg E. Watcher <br />Ececwive Director <br />Hal D Simgon, P E <br />Stale Engineer <br />DATE: April 8, 1999 <br />TO: Carl B. Mount, Senior Environmental Protection Specialist ~U <br />CC: Division 6 Office; Waller Bahrer, District 44 V ater Commissioner ••t~G~\v <br />FROM: Craig M. Lis ~/~ `~ PQR ~~19~9~agY <br />RE: Wagner Rock, File No. M-99-O1 S ~ to <br />Opzrator: Wagner Construction, Inc. n5•gpotM <br />Contact: Jay Wagner <br />Section 10, Twp 6 Narth, Rng 90 West, 6th P.PQ., Moffat County <br />CONDITIONS FOR APPROVAL <br />The proposed operation does not anticipate exposng groundwater. Therefore, exposure of ground <br />water must not occur during or after mlmng operati ans. <br />^ The proposed operation will consume ground ~~atzr by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water rzmoved in the mined product, ^ processing, ^ other.. <br />Prior to initiation of these uses of ground water, th~: applicant will need to obtain either a gravel pit <br />or other type of well pznnit, as applicablz. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is req~.iired. <br />^ Prior to approving a well permit, the applicant roust conduct a field inspection of [he site and <br />document the locations of all wills within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of die pztmit aria or <br />request a heanng before the State Engineer. <br />^ Other: <br />COMMENTS: Since [he excavation will be on a ridgzlice, it does not appear that ground water will be <br />intercepted. However, in the event [hat ground water 13 zncounterzd, water is currently available for <br />appropriation in this aria, so an augmentation plan will not oe necessary. <br />