My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47749
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:46 PM
Creation date
11/20/2007 1:17:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
3/4/2002
Doc Name
Reqest to Install Gob Vent/De-Gas Boreholes on USFS Lands
Section_Exhibit Name
Exhibit 80 Drilling Activities - MR273
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• RECLAMATION PLAN <br />Reclamation activities of pads and roads will follow when it is decided by MCC that the <br />drill holes are not performing their intended purpose. <br />• <br />l . Upon completion of each phase of activity at a given site, all debris, trash, and <br />drilling related equipment, or de-gas housing will be removed from the site. <br />2. When the mud pit is sufficiently dry, it will be filled with stored soil material <br />and compacted to minimize any settling. <br />3. A backhoe and a bulldozer will redistribute material on and around the drill <br />pad to achieve as closely as practicable the original contour of the site. The <br />area will then be ripped or scarified. <br />4. Stored topsoil will be distributed as evenly as possible over the disturbed pad <br />azea. <br />5. The entire drill pad area will be re-seeded using an approved USFS seed mix. <br />The following seed mix is an example of a seed mix that has been approved <br />by the USFS for drill sites on adjacent lands: <br />Soecies <br />Mountain Brome - Bromus Mazginatus 4 <br />PLS lb/Acre <br />Orchard Grass - Dactylis Glomeratea 2 <br />Pubescent Wheatgrass - Agropyron Trichoporum 3 <br />Timothy - Pleum Pratense <br />2 <br />Arizona Fescue - Festuca Arizonical 3 <br />Alsike Clover - Trifolium Hybridum <br />This seed mixture will be a minimum of 90 percent pure live seed <br />and applied at the rate of 30 pounds per acre. <br />6. The pad areas will be fertilized (30-0-0, minimum NPK), seeded with the <br />approved seed mix, and mulched (certified weed-free straw). <br />7. The access roads will be restored as closely as possible to the approximate <br />original contour, re-seeded, fertilized, and mulched as above. <br />8. The drill pads and access roads reclamation procedure outlined above will <br />apply only to those areas newly disturbed for this proposed project. Existing <br />roads will be left in a condition equal to or better than that observed on <br />• Mountain Coal Company's entry into the area or to the satisfaction of the <br />USFS representative. <br />
The URL can be used to link to this page
Your browser does not support the video tag.