KERR COAL COMPANY BONDING COST ESTIMATE
Section_Exhibit Name
EXHIBIT 58
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• equipment to the site. Mobilization/Demobilization cost calculations are <br />summarized in Appendix C, Cost Documentation. These costs include the <br />costs associated with the main reclamation project and subsequent <br />reclamation of sedimentation ponds. <br />The project costs for job supervision are based upon the total project <br />duration assuming 3 operating shifts per day. The wage rate for a job <br />foreman was determined from the current Operating Engineers contract for <br />Zone 2. Supervision costs include the cost of a four-wheel drive pickup <br />as indicated in Appendix C, Cost Documentation. <br />Determination of Total Estimated Bond Surety <br />The total estimated bond surety necessary to provide for complete <br />reclamation of the Mine was determined by adding the total direct project <br />costs and the project overhead and profit figures. <br />Summary and Conclusions <br />Pursuant to the requirements of Stipulation R4 contained in the renewal <br />document for the Permit and various meetings and correspondence with the <br />MLRD, Kerr has determined that the proper amount is E5,346,285. This <br />amount reflects the utilization of the most accurate and current <br />information available to estimate the cost which would be incurred by the <br />• MLRB in the event of bond forfeiture by Kerr. The costs for the various <br />tasks associated with the entire reclamation project are summarized below. <br />• <br />11R Revised 4/90 <br />