Laserfiche WebLink
III IIIIIII 9 111111111 <br /> 99 <br /> Doc Date:12/11/2001 <br /> SECTION 1.0 1989 Annual Reclamation Report <br /> As specified by the revisions (1/3/90) to 2CCR 407-2, 2.04.13, page 74, Trapper Mine is <br /> submitting an Annual Reclamation Report for the previous calendar year (1989). <br /> Historically section 3.5.3 of Trapper's mining and reclamation permit required a recla- <br /> mation map be submitted to the CMLRD annually by March 15th. Prior to 1988 that <br /> map was entitled the "Postmine Contour Map." As requested the title was changed in <br /> 1988 to 'Reclamation Map." That reclamation map was developed from aerial pho- <br /> tographs taken during the previous fall showing the pit advancements, recontoured spoil <br /> areas for the year and an historical account of the previously regraded areas. <br /> This year's report is formatted as specified by the 1990 revisions. The 1989 reclamation <br /> map is a composite of the aerial photographs taken in September, 1989, and the recla- <br /> mation performed during 1989 for all areas under bond. The map(s) (1.0) show the <br /> location and number of acres for the acres disturbed, the acres backfilled and graded, <br /> the acres topsoiled and the acres revegetated during 1989. In addition, the location, <br /> number of acres and the planting dates for all previously revegetated acres are <br /> displayed. <br /> 1.1 Permittee Identification <br /> �v The permittee for this annual reclamation report is: <br /> Trapper Mining Inc. <br /> P.O. Box 187 <br /> Craig CO 81626 <br /> Permit No. (C-81-010) <br /> 1.2 Results <br /> The 1989 reclamation results are presented in Table 1.1 and map(s) 1.0. The various <br /> reclamation stages are addressed below in separate subsections. <br /> 1.2.1 Disturbed Acres (1989) <br /> In 1989, Trapper disturbed 236 acres resulting from topsoil salvage, haulage <br /> corridor construction, and topsoil stockpile construction. This also includes <br /> redisturbance of 9.8 acres of 1978-1979 Ashmore pit reclaim due to the boxcut <br /> operations for Browning (B) pit. — <br /> 1.2.2 Backfilled and Graded Acres (1989) <br /> Trapper backfilled and graded to final contour (AOC) approximately 191 acres <br /> �_ in 1989. These acres were in Ashmore, Derringer and Colt pits. <br />