My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47695
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47695
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:43 PM
Creation date
11/20/2007 1:16:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004061
IBM Index Class Name
Permit File
Doc Date
9/24/2004
Doc Name
Response to Appl Consideration
From
OSE
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TATS OF COLORADO <br />OFFICE OF THE STATE ENGINEER SEP 2 4 2004 ,~ <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 D'tYision ~f Minerals and Geob~ <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 Res onse to Reclamation Permit A lication Consideration <br />FAX (303) 866-3589 p pp <br />www. Ovate rstate. co. us <br />DATE: September 24, 2004 <br />TO: ~ Kate A. Pickford, Environmental Protection Specialist <br />CC: Division 5 Office; District 51 Water Commissioner <br />FROM: Cynthia J. Love, Water Resource Engineer ~Q,~ <br />// <br />RE: Operator: Linke Construction Inc., Cottonwood Quarry, File No. M-2004-061 <br />Section 23, Twp 1 N, Rng 77 W, 6th P.M., Grand County <br />Landowner- Ei ht Mile LLC <br />CONDITIONS FOR APPROVAL <br />pF Cp~p <br />Ih ~~ <br />I~x <br />~ t876 ~` <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Hal O. Simpson, P.E. <br />State Engineer <br />® The proposed operation does not anficipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />^ The proposed operation will consume ground water by ^evapotation, ^dust control, ^reclatnation, ^water <br />removed in the mined product, ^processing, ^other: <br />Prior to initiation of these uses of grolmd water, the applicant will need to obtain either a gravel pit or other type <br />of well permit, as applicable. Prior to obtaining a pemilt, an approved water supply plan or decreed plan for <br />augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a Seld inspection of the site and document the <br />locations of all wells within 600 feet mile of the permit azea. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or contact this office regarding the <br />600 foot spacing notification/heazing process. <br />® The proposed operation may have potential impact on existing water rights near the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />® The applicant has indicated plans to use other water for:_X_uses at the permit site, -storage in the <br />excavated area(s). The applicant will need to provide evidence to this office that the water is permitted or <br />decreed for such uses. <br />^ Other: <br />COMMENTS: <br />
The URL can be used to link to this page
Your browser does not support the video tag.