Laserfiche WebLink
~ i <br />EXHIBIT G <br />4Jater Information <br />This sand and gravel operation is not expected to directly affect <br />surface or groundwater systems other than evaporation from the ponds. <br />This water will be re p1 aced by augmentation of water from 5/6 of a <br />share of Big Thompson Ditch and Manufacturing Co. water. Water <br />used in the crushing and washing operation will be pumped into the Big <br />Thompson River after detention in a settling pond. A copy of the <br />National Pollutant Discharge Elimination System application for a <br />permit to discharge is enclosed as part of this exhibit. There are <br />no known wells being used for domestic purposes in the immediate area <br />so no draw down or pollution problems are anticipated. <br />