Laserfiche WebLink
<br /> <br /> <br /> <br />SUNA'fARY OF RE~gT~'QNj CLj9`Y:i,.T~OPI <br />Probasco Pit,~E~au`~~ori' eavatin{g~~Company Inc, <br />Reloading and hauling stockpiled top soil from strippings oY <br />pit, placing on slopes from low water level to top of slopes <br />or existing contours and seeding, Anticipated low water <br />elevation 4922 to finish existing contour 4928 and 4930. <br />Slopes will be~a minimum of 3/1 nn straight aways and 4/1 and <br />5/1 on saucering at intersections, and some parking areas as <br />shown on reclamation p]an, <br />Estimated cost by cubic yards of material to be hauled and <br />finished, approximately $5,000,00 plus X1,500,00 for seeding <br />and some sh~zbbery, <br />The reclamation cost on this pit, consisting of 10.4 mineable <br />acres, would be an average cost per acre of approximately w625.00, <br />L <br /> <br /> <br />