Laserfiche WebLink
EFCI to evaluate and determine the success of mine plans, drainage and <br />sediment control facilities, and reclamation for the purpose of minimizing <br />disturbance to the hydrologic balance and assuring the success of proposed post- <br />mining land uses. <br />Monitoring data collected over the water year from June through May is <br />submitted to the CMLRD on or before August 1 of each year. Since EFCI reports <br />discharges in accordance with its NPDES permits on a quarterly basis, EFCI will <br />notify the CMLRD of NPDES report filings in compliance with Part 4.05.13 (2) (ii) <br />(b). EFCI will also notify the CMLRD of any possible non-complying discharges <br />within five (5) days of receiving analytical results indicating possible non- <br />compliance. If non-compliance with a NPDES permit effluent limitation does <br />occur, EFCI will forward the analytical results concurrently with the written <br />notification of noncompliance. <br />EFCI will continue surface and groundwater monitoring activities after completion <br />of reclamation operations to document restoration of pre-mining hydrologic <br />characteristics. Monitoring will be discontinued when untreated surface runoff <br />meets applicable effluent limitations and the CMLRD approves removal of <br />drainage and sediment control structures. <br />4.05.14 TRANSFER OF WELLS <br />EFCI currently has no plans to transfer ahy exploration boreholes or monitoring <br />wells for subsequent use as water wells. <br />MR-50 4.05-26 Revised -June 2003 <br />