Laserfiche WebLink
<br />-3- <br /> <br />5) This permit may be revoked or suspended for non-compliance with the Act or applicable <br />rules or regulations promulgated by the Board, the permit, or by violation of a Board Order. <br />6) a) Pursuant to 34-32.5-I 18(5) of the Act, the Board has a right of entry to reclaim [he <br />lands affected by the operation, or [o respond to an emergency as defined by C.R.S. 34-32.5-121(2) <br />b) The Board will enter the lands to perform reclamation only if the Board has <br />determined: <br />i. that reclamation required by law to have been performed upon such lands <br />has not been performed, and <br />ii. that fmancial warranty forfeiture proceedingsdescribed in the Act or similar <br />provisions of subsequent laws, if any, have been initiated. <br />c) The Division, acting for [he Board, will enter lands to respond to an emergency only <br />where the Division determines that any of the conditions of Construction Material Rule 8.4.2. exist. <br />7) The additional conditions set forth in the attached rider, if any, are incorporated herein by <br />reference. <br />// a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />iL B. LONG <br />Director <br />\ [~~ <br />J <br />M~\OSS\BDC\TEM P\MAP'_8015 A1W <br />