My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47574
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47574
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:35 PM
Creation date
11/20/2007 1:13:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004031
IBM Index Class Name
Permit File
Doc Date
7/28/2004
Doc Name
First Adequacy Comment Response
From
Tetra Tech RMC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br />Nothing contained herein is intended to imply that the Contractor does not have the right to have tests <br />performed on any material at any time for his own information and job control so long as the Engineer does not <br />assume responsibility for costs or for giving them consideration when appraising quality of materials. <br />1.03 TEST REPORTS <br />Reports of all tests made by testing laboratories shall be distributed by the testing laboratory as follows: <br />1 copy -Contractor <br />1 copy -applicable supplier or Subcontractor <br />1 copy -Engineer <br />Other copies - as directed. <br />1.04 CONTRACTOR'S QUALITY CONTROL SYSTEM <br />A. General <br />The Contractor shall establish a quality control system to perform sufficient inspection and tests of all <br />items of work, including that of Subcontractors, to insure conformance to the Contract Documents for <br />materials, workmanship, construction, finish, functional perfomrance and identification. This control <br />shall be established for all construction except where the Contract Documents provide for specific <br />compliance tests by testing laboratories or the Engineer. The Contractor s quality control system shall <br />specifically include all testing required by the various sections of the Specifications. <br />The Contractor's quality control system is the means by which he assures himself that his constmction <br />complies with the requirements of the Contract Documents. Controls shall be adequate to cover all <br />construction operations and shall be keyed to the proposed constmction schedule. <br />END OF SECTION <br />7/04 Section 01400 -Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.