DRAFT <br />Nothing contained herein is intended to imply that the Contractor does not have the right to have tests <br />performed on any material at any time for his own information and job control so long as the Engineer does not <br />assume responsibility for costs or for giving them consideration when appraising quality of materials. <br />1.03 TEST REPORTS <br />Reports of all tests made by testing laboratories shall be distributed by the testing laboratory as follows: <br />1 copy -Contractor <br />1 copy -applicable supplier or Subcontractor <br />1 copy -Engineer <br />Other copies - as directed. <br />1.04 CONTRACTOR'S QUALITY CONTROL SYSTEM <br />A. General <br />The Contractor shall establish a quality control system to perform sufficient inspection and tests of all <br />items of work, including that of Subcontractors, to insure conformance to the Contract Documents for <br />materials, workmanship, construction, finish, functional perfomrance and identification. This control <br />shall be established for all construction except where the Contract Documents provide for specific <br />compliance tests by testing laboratories or the Engineer. The Contractor s quality control system shall <br />specifically include all testing required by the various sections of the Specifications. <br />The Contractor's quality control system is the means by which he assures himself that his constmction <br />complies with the requirements of the Contract Documents. Controls shall be adequate to cover all <br />construction operations and shall be keyed to the proposed constmction schedule. <br />END OF SECTION <br />7/04 Section 01400 -Page 2 of 2 <br />