Laserfiche WebLink
DRAFT <br />DIVISION 1 -GENERAL REQUIREMENTS <br />SECTION 01050 -FIELD ENGINEERING <br />1.01 SURVEYING <br />The engineer will field establish horizontal and vertical control points. The engineer shall also provide offset <br />staking of [he centerline slurry wall alignment. <br />1.02 SUPERVISION <br />The contractor shall have supervision, be knowledgeable of the project requirements and proper installation <br />and construction procedures, and be available in the field at all times that work is progressing. <br />END OF SECTION <br />7/04 Section 01050 -Page 1 of 1 <br />