Laserfiche WebLink
+ • <br />MINING PLAN <br />EXHIBIT D (CONT) <br />stripped from thi~area-pr-ior__to_use a~d_will_be-stockpiled-for <br />use rniuse eclamation. -Once this is done and the processing <br />equipment is set up, an area of approximately 15.00 acres will be <br />stripped adjacent and north of the Plant Site, this is where <br />mining will begin on Sharkey's Lake. A,dra~ll b.Q used to <br />open a.~pond_on which a gravel dredge will_be set. <br />The dredge is c---ape~-le of mining to depths of 60+ feet and is <br />the most feasible way to mine this particular type o material. <br />Once the dredge and dredge boat are floating, mining will proceed <br />to the north towards the river until the area boundary line is <br />reached alon~the circular road. The mining face will be worked <br />across the entire lake width as shown on the Mining Plan Map. <br />Mining will work in a clock wise direction around this first area <br />until all material is removed. The dredge will then move south <br />of the Plant Site and begin mining to the south to area boundary <br />line. This material will be processed_at the_Plant_Site_or_used <br />to build internal roads needed at startup..-. <br />In the Highlands Lake area we will start mining on the west <br />end of the terrace deposit, using frontend loaders and scrapers <br />to remove the material. 8 mins~inq~9_gr~sses_lI1 th~~ araa-We- <br />will only remove the material that is above water at this time. <br />This will level the bench off so it is consistent with the lower <br />elevations of the area.~This_ area will _then._be_.resoiled_and <br />-seed"2d unt-il >~i'riing returns to_ mine the entire Highland Lake area <br />'ra er inn t-he fife of~ the mine. <br />--ale wi-11 employ a~dredge to remove the material that is below <br />the water table on the larger lake. Because of the depth of the <br />material, a dredge is the most efficient way to move this <br />material on the larger areas without the cost becoming prohibi- <br />tive. A central pivot point for the dredge will be located on <br />the Plant Site area, this point is where the pipe from the dredge <br />reaches the lake shore. The pivot point may change as mining <br />progresses, in the beginning it will be on the west side of the <br />Plant Site. When mining is complete in a given area the dredge <br />will be removed and the remaining small area under the Plant Site <br />will be mined using a dragline. <br />When the dredge is used the extracted materials will be <br />moved to the Plant Site via an enclosed pipe that is part of the <br />dredge. Here it will be run thru a Sauerman or some other piece <br />of equipment to separate the sand and gravel we are interested <br />in. The gravel will then be processed and stockpiled in the <br />Plant Site area until it is removed to market. <br />As mining ends in the Sharkey's Lake area we will notify the <br />Division what area will be mined next. The size, type or <br />material and market will determine what area will be mined next. <br />Unfortunately we are not able to guess where that may be at this <br />time. For this reason the arrows on the mining plan map show the <br />direction mining will take place in the first area only. The <br />plant site may move with mining. We chose a central point <br />initially because the amount of gravel in close proximity allows <br />it to be there for a long time and also place it as far from the <br />7 <br />