Laserfiche WebLink
<br />EXHIBIT M <br />OTHER PERMITS AND LICENSES REQUIRED <br />1. An Air Pollution permit will be applied for prior to com- <br />mencement of operations. <br />2. We have applied for a Use by Special Review permit from Weld <br />County <br />3. This is a open pit operation and ground water will be ex- <br />posed so a well permit and temporary supply plan is <br />necessary. <br />4. A dredge fill permit (404) is not required at this time <br />because waters of the U.S. will not be impacted. If wetland <br />areas are mined we will obtain the necessary permit. <br />5. A Storm water Management Plan (SWMP) will may be necessary <br />for this pit if there is discharge from the mined area. <br />6. A NPDES permit to dewatering will be obtained prior any <br />discharge of water from the site. <br />48 <br />