EXHIBIT B <br />fdINING PLAN <br />A. THE TOPSOIL WILL BE REf40VED TO A MINIMUM DEPTH OF 2" - 6" AND <br />STOCKPILED IN THE NORTHEAST CORNER OF THE AFFEL;ED AREA AS SH041N <br />ON MAP. <br />B. CONSTRUCTION MATERIAL WILL BE REMOVED WITH FRONT-ErJD LOADERS AND <br />DOZERS STARTING FROM THE SOUTHI•IEST CORNER AND 410RK:^JG TO THE <br />NORTEAST. TRANSPORTATION TO THE PROJECT AREA IS BY TRUCK. <br />C. THERE 4JILL BE fJ0 GROUNDIdATER OR SURFACE 'AATFR RIGHTS INVOLVED IN <br />T..E OPERATION. NO WATER TABLE IS ANTICIPATED TO BE ENCOUNTERED <br />IN THE EXCAVATION. THERE WILL BE NO WATER REQUIRED FOR ANY ASPECT <br />Or THE OPERATION. <br />D. THE ACTUAL AREA TO BE MINED WILL COVER 10 ACRES, AS SH04!N ON <br /> MAP. <br />E. THE TOTAL AFFECTED AREA 41ILL COVER NO MORE TI'AN 40 ACRES AS SHOI.1fJ <br /> ON MAP. <br />F. TIr1ETABLE OF OPERATIONS: THE PROJECT I•IILL BE IN AN UNKN04JN AMOUNT <br /> OF STAGES DEPENDING ON WHEN GROUND IS NEED ED FOR SURFACING ROADS <br /> IN THE AREA. <br />G. THE MATERIAL TO BE f1INED WILL BE SAND AND GRAVEL. <br />H. NO MORE THAN 25,000 TONS OF MATERIAL 41ILL BE MINE D INCLUDING <br /> OVERBURDEN. <br />I. A FUGITIVE DUST PERMIT HAS BEEN APPLI ED FO R FROM T1JE STATE 11EALT1~ <br /> DEPT. <br />