My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE47474
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE47474
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:49:29 PM
Creation date
11/20/2007 1:10:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/2/2006
Section_Exhibit Name
Exhibit 74 Monument Dam -Minnesota Reservoir Structure Inventory
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FUND REQUIREMENT SCHEDULE <br />r1 <br />LJ <br />r1 <br />L~ <br /> <br />It is anticipated that this project would require two years to complete. <br />During the first year of the project, design engineering, right of way <br />acquisition and permitting would be completed <br />The estimated cost of this <br />work is $60,000. <br />During the second year, construction would take place. The estimated cost <br />of construction, construction engineering and other administrative <br />functions is $734,160 assuming all contingency funds are required. <br />OPERATION, MAINTENANCE AND REPLACEMENT COSTS <br />The Ditch Company's current operating costs are shown on the income and <br />expense records attached in the Appendix. This project will not affect <br />those costs. <br />VII-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.