Laserfiche WebLink
FUND REQUIREMENT SCHEDULE <br />r1 <br />LJ <br />r1 <br />L~ <br /> <br />It is anticipated that this project would require two years to complete. <br />During the first year of the project, design engineering, right of way <br />acquisition and permitting would be completed <br />The estimated cost of this <br />work is $60,000. <br />During the second year, construction would take place. The estimated cost <br />of construction, construction engineering and other administrative <br />functions is $734,160 assuming all contingency funds are required. <br />OPERATION, MAINTENANCE AND REPLACEMENT COSTS <br />The Ditch Company's current operating costs are shown on the income and <br />expense records attached in the Appendix. This project will not affect <br />those costs. <br />VII-4 <br />